Nieuwkoopse plassen

Client: Water board in cooperation with nature conservation authority
Location: Nieuwkoopse plassen
Period: 2012-2013
Scope: Digging peat holes
Removing wood
Contract form: RAW (specification system for civil and hydraulic engineering works) specifications
Description: Under contract to the water board, 6.0 hectares of woods were removed and approx. 5.0 hectares of peat holes were dug. In addition, several dams were constructed (double row of piles with fascines).
Equipment: Waterking WK 80, WK 220 and WK 250, wood shredder, booster station and shredder pontoon.