Zuidlaardermeer

Client: l’organisation de protection de la nature
Site: Zuidlaardermeer
Période: 2016-2017
Taille: Déboisement de forêts (y compris le broyage)
Étrépage de roselières
Aménagement de soutènements
Creusement des fosses
Etc.
Forme du contrat: Uniform Administrative Conditions for Integrated Contracts (UAV-gc)
Description: The two-year project is being carried out on behalf of the “Groninger Landschap”. The aim of the project is to increase the area of (water-) reeds to improve the habitat of field-dependent species such as the bittern, great reed warbler, and even otters. This is achieved by creating water pools/graben, cutting reeds and to process the released material to create additional reed wetlands.
Matériel: Waterking WK 90 NG-AW, WK 150 NG-A, WK 220 NG, WK 250 NG-3, tracked dump truck, shredders et divers matériel de dragage (Pontons à rattacher etc.).